Rotor Grinder with Fesicr can be said to be important in the current stage of industrial production, AlPA has been committed to the development and application of equipment such as grading machines for many years, and the grading we produced during many years of development The machine has gradually begun to develop in the direction of modernization, and we believe that we can provide a complete set of production planning programs in a large range.
With the increasing social demand, Rotor Grinder with Fesicr is facing huge challenges. Therefore, ALPA Technology Co., Ltd. persisted, continuously improved the ultrafine pulverization strength, particle size distribution, particle crystal form, etc. to achieve more production.
ALPA, strive to achieve low energy consumption, high yield, non-pollution in ultrafine pulverizer, to achieve good particle size, dispersion, unique and potential performance, improve powder crusher competitiveness, and realize the environment Protection and low power performance.
Technical parameters:
finished product particle size: D50: 3μm
Production capacity: 400kg
Crusher Transmission Chain Protector should be intact, preventing personal injury accidents in the work in the work. Motor base fastening bolts are regularly checked, and the foundation must have sufficient steel to prevent the chain from joking or falling down due to basis, causing transmission failure. Check, repair, and maintenance of the machine, the power supply must be cut off and the sign is applied. It is strictly forbidden to extend the hand or other tools into the machine during the machine operation. Only after the machine is completely stopped, you can clean up and check the machine.
The cable in the pulverizer should have a protective casing.
During the operation, at least each class checks if the compressed air line is leaking, and the water water separation is discharged once. Check if the unloading door is leaking weekly, whether the sealing strip is damaged, whether the discharge link mechanism is in a dead position when closing. Clean the residual material attached to the inner wall of the bucket once a week. Wash the chain, sprocket, and refresh the chain sprocket with diesel brushing. Clean the injector per month while cleaning the inner wall of the mixer and the residual attachment material on the cover. Monthly measurement of a mixer exit andThe variation coefficient of the finished package, the determination of the variation coefficient should be selected for the shortest mixed time.
In addition, users also need to check whether the wire connection in the motor junction box is loose.Clean up the remaining machine attached to the inner wall of the mixer and buffer.Clean up the oil and water separation triple piece to ensure that the air path is smooth.
If there is related requirements, please call us!