How to correctly use the jug crusher and hammer crusher
1, pulverizer Long-term jobs should be fixed on the cement. If the mill is often changed, the pulverizer and the motor are mounted on the base made with angle iron, and the shock absorbing device is installed.
If the pulverizer diesel is dynamic, the power of the two should be made, that is, the diesel power is slightly greater than the pulverizer power, And the belt wheel grooves of the two are consistent, and the outer end of the pulley is on the same plane.
2. After the pulverizer is installed, it is necessary to check the fastening of the fasteners, if there is loose, it must be tightened.
3. Check if the leather belt looseness is appropriate, whether the motor shaft and the pulveroid shaft are parallel.
4 Whether it is good for lubrication.
5. Do not replace the pulley casually, to prevent the transition chamber to produce explosion, or the speed is too low.
6. When the crushed station is started, it will be idled for 2-3 minutes, and there is no abnormal phenomenon.
7. At any time, you should pay attention to the operation of the pulverizer, and the feed should be uniform, to prevent blocking bullies, do not have a long time overload operation. If there is a vibration, noise, the bearing and the body temperature is too high, the outer spray, etc., should be immediately stopped, and the fault can continue to work.
8. Clean up the iron and iron, so as not to enter the crushing chamber of copper, iron, and equivalents.